home | Optimization | Co-Trigeneration

Co-Trigeneration

This application is addressed to those managing – on their own or on behalf of third parties (as ESCO) – cogeneration or tri-generation industrial power plants with the main objective of maximizing the Economic return from such plants according to the applicable technical, commercial and regulatory constraints. The objective is to obtain the optimal hourly Scheduling of the plants supplying energy to a factory, District Heating network, Airport etc of which the power and heat (high and low temperature) requirements are known on an hourly basis over a short to medium term.

Using ResOpt, the power plant modeling becomes simple and intuitive and the Return Of Investment (ROI) becomes certain within a few months from the start of the optimized scheduling.